The power electronics for the conversion of the AC voltage from the charging
socket to direct current
voltage, which is required for charging the high-voltage battery unit, are
housed in the convenience
charging electronics. The AC voltage is supplied as a single phase. The input
voltage, which c
Button in the vehicle
Park assistance button
Ultrasound sensors
With the four side ultrasound sensors, arrows,
and the ultrasound sensors in the bumpers, the
parking spaces are measured and the distances
to obstacles determined.
Functional requirements
Ultrasound sensors
Ensure full functionality